Detailed design and construction supervision was conducted for Hasan Uğurlu Dam and HEPP which is Turkey’s first underground power plant
CLIENT :

General Directorate of State Hydraulic Works

LOCATION :

Samsun

Hasan Uğurlu Dam and HPP

Design and construction supervision services for Hasan Uğurlu Dam (135 m high clay core rockfill dam) and Hydropower Plant (500 MW installed capacity).

Services Provided

• Detailed design of dam body, spillway, tunnels, power plant and other related structures
• Preparation of quantity-cost estimates
• Review of construction drawings
• Site supervision and consulting services during construction