Altınkaya Dam and HEPP, the 6th highest dam in Turkey, was realized by contributing to all phases from planning to construction supervision, including the detailed design phase.
CLIENT :

General Directorate of State Hydraulic Works

LOCATION :

Samsun

Altınkaya Dam and HPP

Altınkaya Dam is located on Kızılırmak River. The dam is 195 m high, rockfill type. Total fill volume of dam body is 15.3 million m³. Installed capacity of the power plant is 700 MW.

Services Provided

• Detailed design of dam body, spillway, tunnels, power plant and other related structures
• Preparation of quantity-cost estimates
• Review of construction drawings
• Site supervision and consulting services during construction