Important steps have been taken for the realization of dams and HEPP projects with cascade systems.
CLIENT :

General Directorate of State Hydraulic Works

LOCATION :

Ağrı

Bulut and Yağmur Dams and HPPs

Feasibility revision, detailed design and construction drawings for Bulut and Yağmur Dams and HPP’s located on Murat branch of Euphrates River in Eastern Anatolia of Turkey. Bulut and Yağmur projects are cascade systems.
Bulut Dam is a hardfill type dam, 51.5 m high from thalweg. Installed Capacity of the HPP is 75.8 MW and planned annual energy production is 159 GWh.
Yağmur Dam is a clay core earthfill type dam, 40 m high from thalweg. Installed Capacity of the HPP is 59.0 MW and planned annual energy production is 128 GWh.

Services Provided

• Preparation of Bulut Dam & HPP and Yağmur Dam & HPP Revised Feasibility Reports
• Detailed design drawings (civil and electromechanical works) for Bulut and Yağmur Dams & HPPs
• Construction drawings for Bulut Dam & HPP and Yağmur Dam & HPP
• Technical Specifications (civil and electromechanical works) for Bulut Dam & HPP and Yağmur Dam & HPP