Altıparmak Dam and HEPP was added to our dam and HEPP project planning portfolio.
CLIENT :

General Directorate of Electric Power Survey Administration

LOCATION :

Artvin

Altıparmak Dam and HPP

Feasibility study for Altıparmak Dam and HPP in Çoruh River Basin, on Barhal creek. The dam is double-curvature thin arch concrete type and 150 m high from foundation. Installed capacity of power plant is 50 MW.

Services Provided

• Review of hydrological studies
• Review of geological surveys
• Operation studies for different dam heights and installed capacities
• Determination of optimum dimensions
• Dam stability studies
• Design of dam body, spillway, tunnels, power plant and other related structures
• Financial analysis