Feasibility study for Altıparmak Dam and HPP in Çoruh River Basin, on Barhal creek. The dam is double-curvature thin arch concrete type and 150 m high from foundation. Installed capacity of power plant is 50 MW.
• Review of hydrological studies
• Review of geological surveys
• Operation studies for different dam heights and installed capacities
• Determination of optimum dimensions
• Dam stability studies
• Design of dam body, spillway, tunnels, power plant and other related structures
• Financial analysis
SUİŞ PROJE provides all engineering and consultancy services from collecting main information such as mapping, geological, foundation and material survey, project design, feasibility (planning), preparation and evaluation of contract documents, contractor selection and construction technical supervision.