General Directorate of İstanbul Water and Sewage Administration
İstanbul
• Condition assessment and rehabilitation of the existing 1st stage water treatment plant with 720,000 m³/day capacity
• Detailed design of 2nd stage water treatment plant with 1,123,000 m³/day capacity
• Architectural and conceptual design of 3rd stage WTP with 1,123,000 m³/day capacity
• Rehabilitation report for 1st stage Water Treatment Plant
• Topographical survey and geotechnical investigations
• Process design for 2nd stage Water Treatment Plant
• Architectural design for 2nd stage Water Treatment Plant
• Statical, mechanical and electrical detailed designs for 2nd stage Water Treatment Plant
• Architectural design for 3rd stage Water Treatment Plant
• Preparation of tender documents as per FIDIC Red Book
SUİŞ PROJE provides all engineering and consultancy services from collecting main information such as mapping, geological, foundation and material survey, project design, feasibility (planning), preparation and evaluation of contract documents, contractor selection and construction technical supervision.