Ministry of Public Works
Albania
Service area of the project covers 87 villages in mountainous regions of Albania accumulated in 5 separate districts, for a total population of 66,000 inhabitants. Total length of transmission lines is 205 km, with varying diameters between Ø80-250 mm. Detailed designs of transmission lines, pumps, reservoirs and other appurtenances and tender documents are prepared.
• Detailed designs of transmission lines, reservoir and pump stations
• Preparation of tender documents and tender assistance
SUİŞ PROJE provides all engineering and consultancy services from collecting main information such as mapping, geological, foundation and material survey, project design, feasibility (planning), preparation and evaluation of contract documents, contractor selection and construction technical supervision.
Copyright © 2024 SUİŞ Proje All rights reserved.