General Directorate of State Hydraulic Works
İstanbul
The project covers revision of feasibility, construction design and preparation of tender documents for water supply scheme in order to supply an additional 226 million m³ water per year for Ankara city.
• Revision of feasibility studies covering population projections, determination of potable water demand
• Geological and topographical field surveys
• Detailed / construction designs of diversion weir and tunnel
• Preparation of tender documents for unit-price tendering (FIDIC Red Book)
SUİŞ PROJE provides all engineering and consultancy services from collecting main information such as mapping, geological, foundation and material survey, project design, feasibility (planning), preparation and evaluation of contract documents, contractor selection and construction technical supervision.