Another step has been taken to solve Izmir’s drinking water problem.
CLIENT :

General Directorate of State Hydraulic Works

LOCATION :

İzmir

İzmir Water Supply, Gördes-Çağlayan Project

Project aims bulk water supply for İzmir, which is the third crowded city of Turkey, on Aegean coast.

Services Provided

• Determination of potable and industrial water demands for 4 167 000 population
• Detailed designs of transmission lines, pumping stations, reservoirs and treatment plant
• Preparation of tender documents