Since 1965

ızmir water supply, gördes-çağlayan project

Project Location

Izmir, Turkey

Client

General Directorate of State Hydraulic Works (DSİ) - The Water Supply and Sewerage Department

Project Description

İzmir is the third crowded city of Turkey, on Egean coast. The project comprises: 
Main transmission line of 4.20 m³/s capacity, 94.5 km long, Ø2000 mm diameter steel pipeline
4587 m long, 3000 mm diameter tunnel
distribution pipelines of 13.5 km Ø1800 mm and 2 km Ø1200 mm, 
Bornova-Naldöken treatment plant (365,000 m³/day  - 15,000 m³/hr)
Çambel pumping station (2 x 2800 kW + 2 x 850 kW) and reservoirs (20000 m³)
in order to supply potable water for İzmir city.


Provided Services

Determination of potable and industrial water demands for year 2030 (4 167 000)
Detailed designs of transmission lines, pumping stations, reservoirs and treatment plant
quantity-cost estimates, tender documents for design / build contract)
Environmental Impact Report involving guidelines for water pollution control and selection of treatment plant process type

Contact

Musa Çetinkaya

Musa Çetinkaya 

Civil Engineer M.Sc. 

cetinkaya@suis.com

Copyright © 2020 | Suiş Proje | All rights reserved. | Design By Cogen®Yazılım