General Directorate of State Hydraulic Works
Sakarya
Performing and interpreting detailed 2D and 3D static and dynamic analyses of the revised rehabilitation projects developed in line with the geotechnical survey reports and the revised rehabilitation projects in the implementation phase with the “Melen Dam Inspection” approved in December 2019 within the scope of the rehabilitation of Melen Dam, again with the current bedrock engineering parameters, Revision of rehabilitation projects for dam body and all other auxiliary structures and all hydromechanical equipment and electrical control and command systems.
• Assessment of physical condition of dam body
• Geotechnical studies
• 2D and 3D static and dynamic geotechnical analyses of dam body and related structures
• Preparing Dam Safety Management Plans
• Dam Instrumentation Plans (IP)
• Seismic hazard including earthquake hazard study assessment
SUİŞ PROJE haritalama, jeolojik, temel ve malzeme etüdü gibi ana verilerin toplanmasından fizibilite (planlama), proje tasarımı, sözleşme belgelerinin hazırlanması ve değerlendirilmesi, yüklenici seçimi ve inşaat denetimi, işletme yönetimi ve sistem araştırmasına kadar geniş bir yelpazede hizmet veriyor, dünya çapındaki projelere uzman mühendislik ve danışmanlık hizmetleri sunuyoruz.
Telif Hakkı © 2024 SUİŞ Proje Tüm hakları saklıdır.