Altınkaya Dam and HEPP, the 6th highest dam in Turkey, was realized by contributing to all phases from planning to construction supervision, including the detailed design phase.
İŞVEREN

General Directorate of State Hydraulic Works

KONUM

Samsun

Altınkaya Barajı ve HES

Altınkaya Dam is located on Kızılırmak River. The dam is 195 m high, rockfill type. Total fill volume of dam body is 15.3 million m³. Installed capacity of the power plant is 700 MW.

Sunulan Hizmetler

• Detailed design of dam body, spillway, tunnels, power plant and other related structures
• Preparation of quantity-cost estimates
• Review of construction drawings
• Site supervision and consulting services during construction