The project area is the whole West Bank. The landlocked territory stretches over an area of 2,183 square miles. The aim of the Project is to support the Palestinian Water Authority (PWA) in developing Bulk Water Master Plan and preliminary design of regional clusters, and developing Water harvesting Master Plan for West Bank. The study also consider the updated Water Sector Policy and Strategy.
Bulk Water Master Plan and Preliminary Design of Regional Cluster
• Technical solutions and associated multi-criteria analysis
• Recommending accompanying measures, and developing phased investment plan
• Preliminary design of Priority regional clusters including work packages and project summary documentation
• Environmental and Social Management Framework
Water Harvesting Master Plan
• Baseline studies
• Conceptual model and groundwater balance of the main aquifers, critical review of relevant studies
• Master Plan includes harvesting water potential, most suitable harvesting techniques, potential projects, recommendations about an appropriate management system, phased investment plan
• Assessment of treated wastewater reuse alternatives
• Environmental and Social Management Framework
SUİŞ PROJE haritalama, jeolojik, temel ve malzeme etüdü gibi ana verilerin toplanmasından fizibilite (planlama), proje tasarımı, sözleşme belgelerinin hazırlanması ve değerlendirilmesi, yüklenici seçimi ve inşaat denetimi, işletme yönetimi ve sistem araştırmasına kadar geniş bir yelpazede hizmet veriyor, dünya çapındaki projelere uzman mühendislik ve danışmanlık hizmetleri sunuyoruz.