The capacity increase for Turkey’s largest drinking water treatment plant has been designed.
İŞVEREN

General Directorate of İstanbul Water and Sewage Administration

KONUM

İstanbul

General Directorate of İstanbul Water and Sewage Administration

• Condition assessment and rehabilitation of the existing 1st stage water treatment plant with 720,000 m³/day capacity
• Detailed design of 2nd stage water treatment plant with 1,123,000 m³/day capacity
• Architectural and conceptual design of 3rd stage WTP with 1,123,000 m³/day capacity

Sunulan Hizmetler

• Rehabilitation report for 1st stage Water Treatment Plant
• Topographical survey and geotechnical investigations
• Process design for 2nd stage Water Treatment Plant
• Architectural design for 2nd stage Water Treatment Plant
• Statical, mechanical and electrical detailed designs for 2nd stage Water Treatment Plant
• Architectural design for 3rd stage Water Treatment Plant
• Preparation of tender documents as per FIDIC Red Book