Malatya Plains Irrigation Rehabilitation

Malatya Plains Irrigation Rehabilitation Irrigation projects were rehabilitated in agricultural areas where 55% of Turkey’s fresh apricot production is produced. CLIENT : 9th Regional Directorate of State Hydraulic Works LOCATION : Malatya Pakistan – Irrigation The purpose of this project is to rehabilitate 9 big irrigation plains of Malatya Plains with a total size of […]

Pakistan – Irrigation

Pakistan – Irrigation Technical assistance is provided for 6 different irrigation canals in Pakistan. CLIENT : Asian Development Bank LOCATION : Pakistan Pakistan – Irrigation Project is to support the development of climate-resilient solutions and efficient project implementation in the agriculture, natural resources, and rural development sector in Pakistan. To achieve this target, “Technical Assistance […]

Mardin-Ceylanpınar Plains Irrigation

Mardin-Ceylanpınar Plains Irrigation The Southeastern Anatolia Project (GAP) was planned to carry the water from Atatürk Dam from Şanlıurfa to Mardin with the main canal line that will bring together the water of the Mardin Plain and the Euphrates. CLIENT : General Directorate of State Hydraulic Works LOCATION : Mardin, Şanlıurfa Mardin-Ceylanpınar Plains Irrigation Project […]

Ağdam Bölgesinde İyileştirme ve Su Yönetimi Kompleksinin Restorasyonu ve Geliştirilmesi

The Restoration and Development of Amelioration and Water Management Complex in Agdam Region A total of 45,810 ha of irrigation area, approximately 94 km of main lines and more than 860 km of irrigation networks are brought to the region in three separate areas. CLIENT : Azerbaijan Amelioration and Water Management Open Joint Stock Company LOCATION : […]

Samur-Apsheron Irrigation System

Samur-Apsheron Irrigation System Integrated water management for Azerbaijan and water resources management for the most important sectors in need of water: drinking water, agriculture and energy. CLIENT : Azerbaijan Ministerial Committee of Land Reclamation and Water Usage LOCATION : Azerbaijan Samur-Apsheron Irrigation System Project comprises upgrading existing 184 km main canal in Samur-Apsheron system, construction […]

The Restoration and Development of Amelioration and Water Management Complex in Qubadlı

The Restoration and Development of Amelioration and Water Management Complex in Qubadlı With more than 46 km of main pipelines, approximately 38 km of which are steel, a total of 5,653 ha of irrigation area is brought for the city’s agricultural activities. CLIENT : Azerbaijan Amelioration and Water Management Open Joint Stock Company LOCATION : Azerbaijan […]

Lower Cekerek – Kazankaya Weir and Geldingen Plain Irrigation

Lower Cekerek – Kazankaya Weir and Geldingen Plain Irrigation Smart irrigation systems implementation projects were prepared for the Lower Çekerek irrigation areas. CLIENT : 7th Regional Directorate of State Hydraulic Works LOCATION : Çorum, Yozgat, Amasya Lower Cekerek – Kazankaya Weir and Geldingen Plain Irrigation Project covers detailed design for 19,000 hectares of piped irrigation […]

Şanlıurfa-Viranşehir Pumped Irrigation

Şanlıurfa-Viranşehir Pumped Irrigation One of Turkey’s most important irrigation projects has been prepared. CLIENT : General Directorate of State Hydraulic Works LOCATION : Şanlıurfa Şanlıurfa-Viranşehir Pumped Irrigation Şanlıurfa-Viranşehir Pumped Irrigation Project is part of Southeastern Anatolian Project (GAP). 35,558 ha of land will be irrigated by means of Şanlıurfa-Viranşehir Pumped Irrigation Project.Viranşehir Irrigation main canals […]

GAP Batman-Silvan Project

GAP Batman-Silvan Project Within the scope of the GAP Batman-Silvan Project, water and soil resources were developed and dams and HEPPs were planned for irrigation areas, energy production and water utilization. CLIENT : General Directorate of State Hydraulic Works LOCATION : Batman, Diyarbakır GAP Batman-Silvan Project Project is part of Southeastern Anatolian Project (GAP) and […]