Feasibility study for Altıparmak Dam and HPP in Çoruh River Basin, on Barhal creek. The dam is double-curvature thin arch concrete type and 150 m high from foundation. Installed capacity of power plant is 50 MW.

Sunulan Hizmetler

• Review of hydrological studies
• Review of geological surveys
• Operation studies for different dam heights and installed capacities
• Determination of optimum dimensions
• Dam stability studies
• Design of dam body, spillway, tunnels, power plant and other related structures
• Financial analysis