Blog

Cumhuriyet Su Arıtma Tesisi, 2. Etap

General Directorate of İstanbul Water and Sewage Administration The capacity increase for Turkey’s largest drinking water treatment plant has been designed. CLIENT : General Directorate of İstanbul Water and Sewage Administration LOCATION : İstanbul General Directorate of İstanbul Water and Sewage Administration • Condition assessment and rehabilitation of the existing 1st stage water treatment plant […]

Operational Design and Business Model – Pakistan

Operational Design and Business Model – Pakistan Evaluation of all infrastructure has been conducted for seven different cities in Pakistan. CLIENT : Local Government and Community Development Department, Government of Punjab LOCATION : Pakistan  Operational Design and Business Model – Pakistan Aim of the project is to assist 7 cities’ (Rawalpindi, Multan, Sargodha, Dera Ghazi […]

Bodrum Peninsula Urgent Water Supply Project

Bodrum Peninsula Urgent Water Supply Project The goal is to provide sustainable drinking and utility water to Bodrum. CLIENT : General Directorate of State Hydraulic Works LOCATION : Muğla Bodrum Peninsula Urgent Water Supply Project The main scope of the project is to maintain urgent potable water supply of Bodrum Peninsula – one of the […]

Ankara Water Supply Project – Gerede System

Ankara Water Supply Project – Gerede System Ankara’s water needs are being met until 2050 with Turkey’s longest drinking water tunnel! CLIENT : General Directorate of State Hydraulic Works LOCATION : İstanbul Ankara Water Supply Project – Gerede System The project covers revision of feasibility, construction design and preparation of tender documents for water supply […]

Greater Istanbul Water Supply Project II.Stage-Yeşilçay System

Greater Istanbul Water Supply Project II.Stage-Yeşilçay System With an additional supply of 145 million m3 of water, 2 million Istanbul residents now have access to clean drinking water meeting European standards! CLIENT : General Directorate of State Hydraulic Works LOCATION : İstanbul Greater Istanbul Water Supply Project II.Stage-Yeşilçay System The objective of Yesilçay Project is […]

İzmir Water Supply, Gördes-Çağlayan Project

İzmir Water Supply, Gördes-Çağlayan Project Another step has been taken to solve Izmir’s drinking water problem. CLIENT : General Directorate of State Hydraulic Works LOCATION : İzmir İzmir Water Supply, Gördes-Çağlayan Project Project aims bulk water supply for İzmir, which is the third crowded city of Turkey, on Aegean coast. Services Provided • Determination of […]

Revised Rehabilitation Design of Melen Dam

Revised Rehabilitation Design of Melen Dam Melen Dam is being reinforced to solve Istanbul’s water problem. CLIENT : General Directorate of State Hydraulic Works LOCATION : Sakarya Revised Rehabilitation Design of Melen Dam Performing and interpreting detailed 2D and 3D static and dynamic analyses of the revised rehabilitation projects developed in line with the geotechnical […]

TA for Preparation of Erosion Protection Plans and Technical Design Documentation for Flood-Protecting Infrastructure for Selected Priority Areas in Bosnia and Herzegovina

TA for Preparation of Erosion Protection Plans and Technical Design Documentation for Flood-Protecting Infrastructure for Selected Priority Areas in Bosnia and Herzegovina Technical assistance was provided for flood protection infrastructure development for selected regions in Bosnia and Herzegovina. CLIENT : European Union Delegation to Bosnia and Herzegovina LOCATION : Bosnia and Herzegovina TA for Preparation […]