revised feasibility report and detailed design for ıvme hydropower plants

Project Location

Batman, Turkey

Client

Yerson Enerji İnşaat Proje Dan. San. Tic. A.Ş.

Project Description

Ivme HPP project is located on Southeastern Anatolia of Turkey, Batman province, on Tigris River. 
 
HPP scheme is composed of 8 cascade runoff river power plants on downstream of Batman Dam and HPP.
Runoff river power plants are designed as rubber dams to discharge the 3600 m3/s design flood discharge. Total installed capacity of 8 HPP’s is 152 MW and planned annual energy production is 444 GWh.
 
The contract covers preparation of feasibility revision and detailed design of the system.

Provided Services

Revised Feasibility Report
Detailed design drawings (civil and electromechanical)
Technical Specifications (civil and electromechanical)