Since 1965

preparation of detailed and construction designs for gevne-karapinar, eskiköy and duraliler hepps

Project Location

Antalya, Turkey

Client

Ay Elektrik Üretim Ltd. Şti.

Project Description

The assignment covers detailed and construction designs of 3 HEPPs:
- Gevne-Karapınar HEPP: 5.25 MW (Francis)
- Eskiköy HEPP: 2.80 MW (Kaplan)
- Duraliler HEPP: 7.06 MW (Francis)


Provided Services

- Detailed and construction designs (civil, electrical, mechanical)
- Consultancy services during construction

Contact

Kerim Orhon

Kerim Orhon 

Civil Engineer M.Sc. 

orhon@suis.com

Copyright © 2024 | Suiş Proje | All rights reserved. | Design By Cogen® Yazılım, Ankara Web Tasarım