mut & kayraktepe dams & hpps cascade system feasibility report

Project Location

Mersin, Turkey

Client

Yüksel İnşaat A.Ş.

Project Description

Kayraktepe Dam & HPP: Dam body is designed as rockfill embankment with clay core. Height of dam from thalweg is 99.5 m, whereas height from foundation is 160 m. Length of energy tunnels (2) are 250 m. 
Installed capacity of the HPP is 290 MW (2 units) and annual estimated production is 644 GWh.
Mut Dam & HPP: Dam body is designed as rockfill embankment with clay core. Height of dam from thalweg is 113 m, whereas height from foundation is 120 m. Length of energy tunnels (2) are 1250 m. 
Installed capacity of the HPP is 90 MW (2 units) and annual estimated production is 224 GWh.

Provided Services

Hydrological studies covering water budget, reservoir operation studies and floods
Preliminary geotechnical and natural construction materials studies
Preliminary design of dam, diversion weirs, diversion and energy tunnels, conveyance canals and other related civil structures, power houses
Cost estimates for civil and electromechanical works
Financial analysis of the project