Since 1965

muş alpaslan-ıı dam & hpp and ırrigation project

Project Location

Muş, Turkey

Client

General Directorate of State Hydraulic Works (DSİ) - The Investigation, Planning and Allocations Department


Project Description

Feasibility study for Alpaslan II Dam and HPP, located on Murat River - an important branch of Euphrates River - and irrigation of Muş Plain (90,000 ha) by means of water regulated by the dam.

Alpaslan II Dam is 130 m high rockfill type. Installed Capacity of HPP is 200 MW.


Provided Services

  • Hydrology studies covering water budget estimation, reservoir operation study and floods
  • Agricultural Economy
  • Irrigation & drainage system design (primary, secondary, tertiary pipelines)
  • Geotechnical investigations and Natural Construction Materials Survey
  • Optimization of dam height and HPP capacity
  • Quantitiy-cost estimates, economic analysis, preparation of Feasibility Report

Contact

Musa Çetinkaya

Musa Çetinkaya 

Civil Engineer M.Sc. 

cetinkaya@suis.com

Copyright © 2024 | Suiş Proje | All rights reserved. | Design By Cogen® Yazılım, Ankara Web Tasarım