Design Criteria : 

2025 year population   : 1 200 000

Design discharge   : 19779 m³/hour

Incoming BOD concentration  : 203 g/m³

Incoming suspended particle concentration : 300 g/m³

Product BOD concentration   : 25 g/m³

Product suspended particle concentration  : 30 g/m³

Receiving stream  : Porsuk River


Designed Facilities :

1. Pumping Station : 6 units of screw pumps with Q = 1.4 m³/sec per pump

2. Screens : 6 units of automatic cleaning fine screens

3. Grid Chambers : 8 pieces of aerated grid chambers each with 320m³ capacity 

4. Primary Sedimentation Tanks: 16 units of 2412 m³ capacity per unit, linear scraper type tanks.

5. Aeration Tanks : 16 units of 5400 m3 capacity per unit rectangular aeration tanks.

 -  Aeration system consist of 4 units of blowers and diffusers.

6. Final Sedimentation Tanks: 16 units of side intake, 5000 m³ per unit rectangular tank.  55% of waste water will be feeded back to the aeration tanks.

7. Sludge Thickener Tanks : 8 units circular thickener and 4 units pumping station.

8. Anaerobic Digestion Facilities : - 12 units of cylindrical, covered, heated tanks

  - 6 units of open top, 17 m diameter, 14 m high, secondary digestion tanks

  - 3 units of heating center. Compressor units, heat exchangers, heating tanks and pumping units.

9. Dewatering facility : Consist of 4 units of belt filter and polymer dosing

 

Provided Services

Application designs
Quantity and cost estimates
Tender documents for sewage network, transmission line and treatment plant.