çetin dam & hydropower plant feasibility report
Project Location
Siirt, Turkey
Client
Yüksel İnşaat A.Ş.
Project Description
Dam body is designed as rockfill embankment with clay core. Height of dam from thalweg is 150 m. Length of energy tunnel is 6000 m with 8 m diameter. Installed capacity of the HPP is 350 MW (3 units) and annual estimated production is 1230 GWh.
Provided Services
Hydrological studies covering water budget, reservoir operation studies and floods
Preliminary geotechnical and natural construction materials studies
Preliminary design of dam, diversion weirs, diversion and energy tunnels, conveyance canals and other related civil structures, power houses
Cost estimates for civil and electromechanical works