çankırı devrez kızlaryolu dam & ırrigation project
Project Location
Çankırı, Turkey
Client
5th Regional Directorate of State Hydraulic Works, Ankara
Project Description
Feasibility study for 79.35 m high rock fill dam and irrigation system of 1767 ha (1457 ha by gravity and 310 ha by pumping) 14 222 ha will also be irrigated with by means of 4 diversion weirs proposed on downstream.
Provided Services
Hydrological studies
Agricultural Economy
Land Expropriation study
Land classification (Agronomy) and Drainage capacity
Irrigation system design (primary, secondary, tertiary pipelines)
Geotechnical Survey and Natural Construction Materials Survey