Since 1965

bursa orhangazi keramet pumping ırrigation rehabilitation planning engineering services

Project Location

Bursa, Turkey

Client

1st Regional Directorate of State Hydraulic Works, Bursa

Project Description

It is the planning works for the irrigation of the 2798 hectares of the irrigated area with a classical system by pumping from the Lake in the current situation.

All the land surveys and bureau studies required for the preparation of "Bursa Orhangazi Keramet Pumped Irrigation Rehabilitation Planning Report" were carried out; Water potential of Iznik Lake and soil resources are evaluated, hydrology, agricultural economy, expropriation, land classification - soil drainage, procurement of maps or procurement of the map from the relevant Public Institutions or Organizations, geotechnical, natural building materials, report studies to be prepared within the scope of EIA and other studies that will be required within the scope of planning All the proposed facilities within the scope of the project (water intake structure, pumping facilities, pumping transmission lines, regulation tanks, irrigation main transmission line, irrigation area, pressure irrigation network, art structures, material quarries / areas, crushing-screening plants, concrete plants, excavation dump sites, plant soil storage areas, temporary and permanent facilities, roads, etc.) hydraulic, technical, economic and environmental aspects of the feasibility of the "Bursa Orhangazi Keramet Pumped Irrigation Rehabilitation Planning Report" preparation and approval by DSI and approval by the General Directorate of State Hydraulic Works. All proposed facilities within the scope of the consultant project (water intake structure, pumping facilities, pumping transmission lines, regulation tanks, irrigation main transmission line, irrigation area, pressurized irrigation network, art structures, material quarries / areas, crushing-screening plants, concrete power plant facilities, excavation dump sites, plant soil storage areas, temporary and permanent facilities, roads, etc.) alternative and technically and economically solutions were produced and studied at the planning level.



Provided Services

Reports prepared within the scope of the project:
- Hydrology Planning Report
- Land Classification and Drainage Report
- Agricultural Economics Planning Report
- Expropriation Planning Report
- Geotechnical Survey Planning Report ·
- Natural Construction Materials Planning Report
- Rehabilitation Planning Report