altınkaya dam & hpp project

Project Location

Samsun, Turkey


Client

State Hydraulic Works (DSI) Department of Dams and HPP

Project Description

Consultancy services and construction supervision of Altınkaya Dam, which is located on Kizilirmak River, is 195 m high and rockfill type. Total fill volume of dam body is 15.3 million m³. Installed capacity of the power plant is 700 MW.

Provided Services
  • Detailed design of dam body, spillway, tunnels, power plant and other related structures
  • Quantity-Cost Estimates
  • Review of Construction Drawings
  • Site Supervision and Consulting Services During Construction