Since 1965

afyonkarahisar water supply project

Project Location

Afyonkarahisar, Turkey

Client

General Directorate of State Hydraulic Works (DSİ) - The Water Supply and Sewerage Department

Project Description

The project covers design and tender documentation of: 
- raw water transmission line between Akdeğirmen Dam and treatment plant (Q = 492 I/s, L = 21544 m, Ø800 mm GRP pipe), 
- treatment plant (42500 m³/day – 1770 m³/hr),  
- pump station (h=42 m, Q=0.49 m³/s, installed capacity 135 kW)
- pumping main from PS to reservoir (Q = 492 I/s, L = 735 m, Ø800 mm steel pipe), 
- loading reservoir (300 m³ capacity).
- potable water transmission line from loading reservoir to distribution reservoir (Q = 492 I/s, L = 15167 m, Ø800 mm GRP pipe)


Provided Services

- Population projections and determination of potable water demand for year 2040, 
- Geological and topographical field surveys, 
- Detailed / construction designs of transmission lines, reservoirs and pump stations, water treatment plant,
- Preparation of tender documents for turnkey tendering